MRK-Engineeing, LLC
Operation as oil and gas industry supplier
Operation as oil and gas industry supplier
1. 1. Date of commencement of operation as a supplier of the oil and gas industry
1999: Gubkinsky gas field infrastructure development (turnkey procurement) for CJSC “Purgaz”.
1999: Vostochno-Tarkosalinskoye field infrastructure development (turnkey procurement) for JSC “Tarkosaleneftegaz”.
1999: Vostochno-Urengoyskoye and Novo-Urengoyskoye gas condensate fields infrastructure development for CJSC “Rospan International”.
2. 2. Main types of products (services) for the oil and gas industry
| Type of product (service) |
Sales volume, rubles |
| 2005 |
2006 |
2007 |
2008 (forecast) |
| Oilfield facilities construction and procurement |
959 566 621 | 1 235 257 620 | 1 400 000 000 | |
3. 3. The most competitive products (services) and benefits they offer
Selection of equipment and materials that comply with specifications in terms of:
• quality;
• high performance;
• cost;
• completeness and multifunctional performance;
• manufacturer’s warranty;
• life span;
• efficient operation.
Custom services package:
• Evaluation (jointly with the Customer) of design solutions provided by research institutes.
• Design and development of fire safety systems.
• Turnkey construction of facilities.
• Full or partial procurement of equipment and materials through placing orders with manufacturing companies approved by the Customer.
• Transportation and customs services, delivery of products to customers’, contractors’ or the company’s own procurement bases.
4. Permits for use of the products. Certificate number, date of issue and certificate issuing authority
All products supplied by “MRK Engineering” are certified.
5. Major oil and gas industry contracts received over the past five years. Equipment supplied under the contracts and customer names
Gubkinsksoye gas field infrastructure development: customer – CJSC “Purgaz”. Procurement of equipment for export gas pipeline (15 km Ø1220), gas flow-lines, 11 ÌWT auxiliary boiler, substation, accommodation and office facilities. Radio tracking systems for gas production companies. Booster compressor station. “Severnye Kupola” area infrastructure development: supply of casing and tubing Ø57-Ø426. Turnkey procurement.
Vostochno-Tarkosolinskoye field infrastructure development: customer - JSC “Tarkosaleneftegaz”. Procurement of equipment for a gathering station, export gas pipeline, (15km Ø1420), flowlines, 6 and 12 MWt boilers. Expansion of flowline system, construction of gathering stations, auxiliary substation and 8MWt boiler, 6kVpower line, two auxiliary 13MWt modular boilers, 10kWt power plant. Development of gas condensate field infrastructure, construction and procurement of 2 low-temperature gas separation lines. Construction of condensate deethanization plant.
Vostochno-Urengoyskoye and Novo-Urengoyskoye fields infrastructure development. Customer – CJSC “Rospan International". Procurement of equipment for a gathering station (2 lines in Achimovsky area and 2 lines for Valonzhinsky area), tank fleet, methanol facilities, power facilities, nitrogen plant, air compressor, control block.
Khancheyskoye gas condensate field infrastructure development. Customer – LLC “Khancheyneftegaz”. Upgrading of low temperature gas separation plant, construction of gathering station, oilfield infrastructure.
Beregovoye gas filed infrastructure development. Customer – JSC “Sibneftegaz”. Construction of gathering station, export gas pipeline, power lines of 32 km, two modular boilers 8 and 11 MWt, 10MWt stand-alone power plant, supply of electric power to gas well clusters, accommodation and office facilities. Turnkey procurement.
Construction of facilities for Achimovsky area of Urengoy gas fields. Customer – CJSC “Achimgaz”. Turnkey procurement.
Sakha Republic (Yakutia) gasification program. Customer – JSC “Sakhatransneftegaz”. Procurement under the government gasification program.
6. Experience of supplying products (services) to foreign customers over the last five years. Types of products (services), export markets and local projects where the company participated
Byashkizyl field: construction, procurement. Customer – JSC “NK “Turkmenneftegaz”.
Looping of gas pipeline Central Asia – Center IV, procurement., Customer – Ministry of Oil and Gas of Turkmenistan.
Compressor station “Opornoye”, procurement. Customer – LLC “Munaygaz-Engineering”.
Oil pipeline Tengiz (Kazakhstan) - Novorossiysk (RF), supply of chemical laboratories. Customer – CJSC “Caspian Pipeline Consortium – K”
7. Customer feedback process and after-sales service
Customer feedback collection system is in place.
8. Major competitors and their products (services)
N/A.
9. Main suppliers of equipment and materials
The range of supplied products includes more than 15 thousand items. Equipment and materials are supplied by more than 200 companies.
|