ECC "Promtekhbezopasnost", LLC
Operation as oil and gas industry supplier
Operation as oil and gas industry supplier
1. 1. Date of commencement of operation as a supplier of the oil and gas industry
2000: MNPZ – development of safety declaration, organization of expert review of safety declaration.
2. 2. Main types of products (services) for the oil and gas industry
| Type of product (service) |
Sales volume, rubles |
| 2005 |
2006 |
2007 |
2008 (forecast) |
| Engineering measures/ expert review of engineering measures |
2 110 343 | 3 381 819 | | |
| Safety audit, expert review of safety declaration |
1 653 980 | 900 690 | | |
| Examination of normative and technical documentation for compliance with rules and regulations |
264 000 | 1 603 308 | | |
| Assessment of safety of risk analysis documentation |
282 700 | 105 000 | | |
| Assessment of organizational and technical fire safety solutions |
230 432 | 1 139 000 | | |
| Assessment of project documentation safety |
7 353 367 | 1 953 513 | | |
| Development of emergency localization plans/Assessment of emergency localization plans |
403 666 | 401 000 | | |
| Safety audit and diagnostics |
185 388 | 1 487237 | | |
| Safety audits of buildings and facilities |
3 842 175 | 1 112 513 | | |
| Development of oil spill contingency plans/Assessment of oil spill contingency plans |
30 000 | 1 956 610 | | |
| Preparation of safety data sheets for master equipment lists |
718 000 | 952 168 | | |
| Development of safety declarations (for hydrotechnical facilities) |
350 000 | 530 000 | | |
3. 3. The most competitive products (services) and benefits they offer
• development of safety declarations;
• development of book “Engineering measures of civil defense and emergency prevention”;
• development of book “Environment Protection”;
• development of book “Health Protection”;
• development of project documentation;
• development of safety data sheets;
• development of oil spill contingency plans;
• development of emergency localization plans;
• examination of project documentation;
• examination of technical devices;
• examination of buildings and facilities;
• assessment of safety declarations;
• assessment of emergency localization plans;
• assessment of oil spill contingency plan;
• assessment of book "Engineering measures of civil defense and emergency response”;
• assessment of safety data sheet;
• assessment of documentation safety;
• ðàçðàáîòêà òåõíè÷åñêèõ óñëîâèé íà ñïåöèàëüíûå ðàçäåëû ïðîåêòîâ ÈÒÌ ÃÎ ×Ñ;
• assessment of fire safety of projects;
• development of documentation related to industry facilities operation (process procedures, standards, instructions, etc.);
• assessment of projects and inspection of automatic fire safety systems;
• assessment of explosion safety data sheet
4. Permits for use of the products. Certificate number, date of issue and certificate issuing authority
- Certificate of compliance from 11.11.2005, issued by quality system certification body LLC “TEST-ST.PETERSBURG”, valid till 11.11.2008.
5. Major oil and gas industry contracts received over the past five years. Equipment supplied under the contracts and customer names
Development of bookss “Engineering civil defense measures. Emergency prevention measures” in 2005 -2007 (deadlines, customer, activity type):
1) September 2005, LLC “Gazflot”, Development of book “Engineering civil defense measures. Emergency prevention measures” within “Detail design for construction of exploration well #7 of Shtokmanovskoye gas condensate field (continental shelf of Barents Sea) using semisubmersible drilling rig Dipsi-Delta; assistance in getting the document approved by regulatory authorities.
2) May 2006, Worley Parsons International Inc., Development of book “Engineering civil defense measures. Emergency prevention measures”of the project “Integrated development of Piltun-Astokhsky and Lunsky license areas. Onshore Production Facility. Storage pipeline” of Sakhalin-2, Phase 2, assistance in getting the documents in the State Panel of Experts of the Russian Ministry of Emergency Response”.
3) 2005 -2007, Sakhalin Energy Inc., Development of dedicated bookss “Engineering civil defense measures. Emergency prevention measures” of Sakhalin-2 project.
4) December 2006, “Research Institute of Three-Dimensional Planning “ENKO”, Development of book “Engineering civil defense measures. Emergency prevention measures” within “General Urban Plan of Tomsk”.
5) December 2006, CJSC “National Town Planning Institute”, Development of book “Engineering civil defense measures. Emergency prevention measures” within the General Urban Plan of Anapa resort town, assistance in getting the documents approved by regulatory authorities”.
6) June – August 2006, JSC “Almazy Anabara”, Development of book “Engineering civil defense measures. Emergency prevention measures” of construction project “Tanker berthing facilities with a floating landing stage for oil discharge in the port of Yurung-Khaya”, and assistance in getting the documents approved by the Ministry of Emergency Response.
7) March-June 2006, JSC “Lengiprotrans”, Development of dedicated bookss “Engineering civil defense measures. Emergency prevention measures” of the project “Construction of bauxite facility in Komi Republic”, assistance in getting the documents approved by Main Department of Civil Defense and Emergencies of St.Petersburg.
8) June 2006, JSC “Toliattiazot”, Development of book “Engineering civil defense measures. Emergency prevention measures” of the Declaration of Intentions to invest in construction of terminal facilities in Temryuk Area of Krasnodar Region to increase supply turnover to 6 million tons. Assistance in getting the documents approved by regulatory authorities.
9) July – September 2006, JSC “Tuapse Commercial Sea Port, Development of book “Engineering civil defense measures. Emergency prevention measures” of Declaration of Intentions to invest in construction of oil export terminal and renovation of the waste water treatment station. Assistance in getting the documents approved by regulatory authorities .
10) September-November 2006, CJSC “Sintez Petroleum”, Development of book “Engineering civil defense measures. Emergency prevention measures” of Declaration of Intentions to invest in construction of facilities for liquid hydrocarbons transportation to Lavna terminal in Murmansk Region. Assistance in getting the documents approved by the Ministry of Emergency Response.
11) March 2007. LLC “PeterGazEngineering”. Expert review of book “Engineering civil defense measures. Emergency prevention measures” of the project “Renovation of compressor stations of North Caucasus gas pipeline system in Privolnoye-Mozdok area” (“KS “Izobilnoye”). Assistance in obtaining approvals from regulatory authorities. Development of book “Engineering civil defense measures. Emergency prevention measures” of the project “Djubga-Lazarevskoye-Sochi gas pipeline”. Assistance in obtaining approvals from regulatory authorities.
2004-2007 activities: development of safety declarations, expert review of safety declarations (delivery deadlines, customer, activity type and scope):
1) April-August 2004. JSC “Udmurtnefteproduct”. Development of Industrial Safety Declaration.
2) February-August 2004. CJSC “Nord-Alians”. Development of Industrial Safety Declaration of the hydrocarbon unloading facility in the territory of FGUP “Ship Repair Yard #35” in Murmansk. Assistance in obtaining approvals from regulatory authorities.
3) February-August 2004. LLC “Tangra-Oil”. Expert review of Industrial Safety Declaration of project “Renovation of oil unloading station in the territory of FGUP “Ship Repair Yard #35” in Murmansk. Assistance in obtaining approvals from regulatory authorities.
4) July 2004 - March 2005. JSC “Lipetskoblgaz”. Development of Industrial Safety Declaration of hazardous facilities of JSC “Lipetskoblgaz” (branch of “Liquefied Gas”). Organization of expert review of safety declaration of JSC “Lipetskoblgaz” (branch of “Liquefied Gas”). Assistance in getting the declaration approved by regulatory authorities.
5) August 2004 – May 2005. JSC “Tambovoblgaz”. Expert review of the safety declaration of gas filling station of Michurinskmezhraigaz branch of JSC “Tambovoblgaz”.
6) September 2004 – May 2005. JSC “Sakhatransneftegaz”. Expert review of safety declaration of the project “Trunk Pipeline Pavlovsl-Maya of Megion-Kangalas Ulus”, provision of a detailed report.
7) October 2004 – December 2005. LLC “Neftegazproekt”. Development of safety declaration for the project “Construction of Musyushorsky oil field facilities”. Expert review of safety declaration for the project “Construction of Musyushorsky oil field facilities”. Assistance in getting the declaration approved by regulatory authorities.
8) April 2005 – March 2006. CJSC “Preobrazhenskneft”. Development of safety declaration of Preliminary Water Removal Unit “Kolganskaya”. Expert review of safety declaration of Preliminary Water Removal Unit “Kolganskaya”.
9) October 2005 – January 2006. CJSC “IEC “Econeftegaz”. Expert review of safety declaration of trunk condensate pipeline from Chernoerkovskaya Loading Station to Slavyansk loading station of LLC “Kubangazprom” . Assistance in document registration in regulatory authorities.
10) September 2005 – January 2006. LLC “Dmitrievsky Chemical Plant”. Development of safety declaration of LLC “Dmitrievsky Chemical Plant “. Organization of expert review of the safety declaration. Assistance in obtaining declaration approval in regulatory authorities.
11) September 2005 – August 2006. JSC “NAK “Azot”. Development of safety declaration for hazardous facilities of JSC “NAK “Azot”; Organization of expert review of the safety declaration. Assistance in getting the declaration approved by regulatory authorities.
12) August 2005 – March 2006. CJSC “PURNEFTEGAZ”. Expert review of the safety declaration of the project “Construction of the North area of the Cenomanian gas reservoir of Gubkinskoye field”.
13) December 2005 – March 2006. JSC “Giprotyumenneftegaz”. Expert review of safety declaration of the gas pipeline construction project of Nakhodkinskoye field, obtaining of the letter of compliance from regulatory authorities.
14) June – December 2005. LLC “GUP Contract”. Expert review of safety declaration of JSC “Rostovoblgaz”, branch of “Novocherkasskaya Gas Filling Station”.
15) February 2005 – March 2006. LLC “Naryanmarneftegaz”. Expert review of safety declaration of the working project “Expansion of tank fleet”, supplement to the project “Production testing of oil reservoir of Varandeiskoye field”. Assistance in getting the documents approved by regulatory authorities.
16) January – September 2006. LLC “Orgsintez”. Development of safety declaration of LLC “Orgsintez”. Organization of expert review of the safety declaration. Assistance in getting the declaration approved by Federal Service of Environmental, Technological and Atomic supervision and Ministry of Emergency Response”.
17) June – August 2006. Interregional Expert Center. Expert review of safety declaration of hazardous facilities: Akhtashsky Plant of Sour Oil Treatment, Akhtashsky Thermochemical Plant, Akhtashsky oilfield tank fleet; Oil Treatment Plant of NGDU “Bavlylneft”; Severo-Almetievky Plant of Oil Treatment; Sour Oil Treatment Plant of Minnibaevsky Central Oil Gathering Station.
18) April – November 2006. LLC “Neftegazproekt”. Expert review of safety declaration of the project “Expansion and construction of additional well clusters of Yuzhno-Shapkinskoye oil and gas condensate field”.
19) April – June 2006. “GP 23 GMPI MO RF”. Development of safety declaration within Feasibility Study of logistics base renovation project and construction of oil export terminal in Lavna, Murmansk Region; expert review of the safety declaration. Assistance in getting the declaration approved by regulatory authorities.
20) March - May 2006. SJC “Giprosintez”. Expert review of safety declaration of the terminal of the chemical weapons destruction facility in Shchuchansky Area of Kurgan Region (facility1597-T), provision of expert testimony
21) May – November 2006. JSC “NK Rosneft”. Development of safety declaration of the gas filling station CJSC Concern “Nefteproduct”. Expert review of the safety declaration.
22) August – December 2006. JSC “VNIPIneft”. Expert review of safety declaration of Novourengoysky Gas Chemistry Plant, developed by JSC VNIPIneft. Assistance in obtaining the letter of compliance from Federal Service for Environmental, Technological and Atomic Supervision and Ministry of Emergency Response.
23) September 2006 – January 2007. LLC “Sibmetakhim”. Expert review of safety declaration of hazardous facilities of LLC “Sibmetakhim”. Assistance in getting the declaration approved by the Federal Service of Environmental, Technological and Atomic Supervision.
24) October 2006 – January 2007. JSC “Giprosintez”. Expert review of safety declaration of chemical weapons destruction facility, Shchuchansky Area, Kurgan Region (Facility # 1597).
25) February – June 2006. LLC “Oblgaz”. Development of safety declaration for LLC “Oblgaz”. Assistance in obtaining declaration approval from regulatory authorities.
Activities involving development of bookss “Health Protection” in 2005-2007 (delivery deadline, customer, activity type and scope):
1) October 2005 – June 2006. LLC “SakhalinNIPImorneft”. Bookss “Labor and working conditions management. Operation and production control”.
Activities involving expert review of design documentation safety in 2006 (delivery deadline, customer, type and scope of activity):
1) January-April 2006. JSC “NK Rosneft – Purneftegaz”. Expert review of industrial safety of the detail design “Integrated modernization of Tanker Loading Unit”.
2) June 2006. JSC “TETOIL”. Expert review of the feasibility study of oil export terminal construction in Kaliningrad, Rybachy Peninsula.
3) April-July 2006. “GP 23 GMPI MO RF”. Expert review of the feasibility study of the logistics base renovation and oil export terminal construction in Lavna village, Murmansk Region.
Activities involving expert review of industrial safety and development of oil spill contingency plans in 2006 – 2007 (delivery deadline, customer, type and scope of activity):
1) January-September 2006. CJSC “Kkuzbassnefteproduckt”. Development of oil spill contingency plans for Novokuznetskaya Petroleum Depot, methodic support (adjustment, finalization, coordination and approval of the plans).
2) January-September 2006. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency plans for Mariinskaya Petroleum Depot, methodical support (adjustment, finalization, coordination and approval of the plans).
3) January-September 2006. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency plan for Kemerovskaya Petroleum Depot, methodical support (adjustment, finalization, coordination and approval of the plans).
4) March-September 2006. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency plan for Mezhdurechenskaya Petroleum Depot, methodical support.
5) March-September 2006. CJSC “Kuzbassnefteprodukt”. Development of oil contingency plan for Gurievskaya Petroleum Depot, methodical support.
6) April-September 2006. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency plan for Topkinskaya Petroleum Depot, coordination and methodical support.
7) July 2006 – May 2007. CJSC “Shell Neft”. Development of oil spill contingency plan for 6 gas stations, as per the List (Appendix 3); Organization of expert review of the oil spill contingency plan by the Ministry of Emergency Response; Methodical support.
8) August-December 2006. LLC “Sakhalin-Shelf-Service”. Development of oil spill contingency plan for OP “SZMP”, Kholmsk, 159 Lesozavodskaya Street; Organization of expert review of the oil spill contingency plan by the Ministry of Emergency Response; Methodical support.
9) November 2006 – April 2007. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency plan for Gas Station #57.
10) November 2006 – April 2007. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency for Gas Station #66.
11) November 2006 – April 2007. CJSC “Kuzbassnefteprodukt”. Development of oil spill contingency for Gas Station # 23, methodical support, coordination and approval.
12) December 2006 – March 2007. JSC “Tomsknefteprodukt VNK”, Development of oil spill contingency plan, methodical support and preparation for expert review of the plan by the Ministry of Emergency Response.
13) December 2006 – March 2007. JSC “Tomsknefteprodukt VNK”. Development of oil spill contingency plan, methodical support and preparation for expert review of the plan by the Ministry of Emergency Response.
14) December 2006 – March 2007. JSC “Tomsknefteprodukt VNK”. Development of oil spill contingency plan, methodical support and preparation for expert review of the plan by the Ministry of Emergency Response.
6. Experience of supplying products (services) to foreign customers over the last five years. Types of products (services), export markets and local projects where the company participated
SAKHALIN-2 PROJECT
Customer: Sakhalin Energy Investment Company
1. Development of the safety declaration of facilities of Piltun-Astokhskoye field (Phase I: Modernization of platform PA-A).
2. Technical consultations to ensure compliance with current regulatory documents of the Ministry of Emergency Response and Construction Committee of the Russian Federation in the process of development of dedicated book “Engineering civil defense measures. Emergency prevention measures” of the natural gas liquefaction plant project.
3. Phase 1: Technical consultations to ensure compliance with current regulatory documents of the Ministry of Emergency Response and Construction Committee of the Russian Federation in the process of development of dedicated book “Engineering civil defense measures. Emergency prevention measures”. Obtaining of Technical specifications from the Sakhalin Office of the Ministry of Emergency Response. Phase 2: Development of technical specifications for special bookss of projects “Engineering civil defense measures. Emergency prevention measures”, assistance in obtaining approvals from regulatory authorities.
4. Preparation of the expert conclusion on compliance with requirements for emergency prevention and protection of facilities and population (special technical specifications “Safety systems and equipment”).
5. Preparation of the expert conclusion on compliance with requirements for emergency prevention and protection of facilities and population (special technical specifications “Accommodation modules”).
6. Preparation of the expert conclusion on compliance with requirements for emergency prevention and protection of facilities and population (special technical specifications for designing and use of automatic emergency protection system of the natural gas liquefaction plant and other explosion hazardous facilities of Sakhalin-2 project, special technical specifications “Safety distances”).
7. Preparation of a package of documents required to obtain RF Defense Ministry approval for laying Sakhalin-2 pipelines in areas where the Ministry’s facilities may be located, particularly in Korsakovky Area, Sakhalin Island.
8. Evaluation of compliance with requirements of emergency prevention and protection of population and facilities of “Engineering civil defense measures. Emergency response Measures” of Sakhalin-2 project.
9. Preparation of expert conclusion on compliance with requirements of emergency prevention and protection of population and facilities:
- special technical specifications of Project “Quantitative evaluation of risks of hazardous facilities of Sakhalin-2 project at the stage of feasibility study.
10. Expert review and preparation of expert conclusion on compliance with requirements of emergency prevention and protection of population and facilities:
- Project “Oil and gas processing for transportation from Astokhsaya section of Piltun-Astokhskoye license area, Sakhalin-2, phase 1B”.
11. Expert review and preparation of expert conclusion on the safety declaration for Sakhalin-2 facilities:
- Onshore processing facility;
- Oil export terminal;
- Natural gas liquefaction plant.
12. Development of dedicated book “Engineering civil defense measures. Emergency prevention measures” of the project “Oil and gas Processing for transportation from Astokhskaya section of Piltun-Astokhskoye license area. Modernization of platform PA-A”. Methodical support of the document approval by regulatory authorities.
13. Analysis of requirements of Russian regulatory documents for development and implementation of safety management systems in hazardous facilities. Obtaining the document approval from the Federal Committee of Mining and Industrial Supervision.
14. Modernization of platform PA-A (project Sakhalin-2, Phase 1B)
- finalization of industrial safety declaration of platform PA-A;
- organization of expert review of the of industrial safety declaration of platform PA-A
- methodical support of the registration of the safety declaration and expert conclusion in regulatory authorities.
15. Analysis of requirements of the Russian regulatory documents and preparation of recommendations on development of emergency localization plans for hazardous facilities of Sakhalin-2 project.
16. Expert review of accepted design solutions for Natural Gas Liquefaction Plant, Oil export terminal, with regard to their compliance with regulatory documents. Obtaining of expert conclusion from regulatory authorities.
Customer: Sakhalin Energy Investment Company
1. Development of book “Engineering civil defense measures. Emergency prevention measures” of the project “Construction of trunk pipelines in OBTK-km93 area, Sakhalin-2 project, Phase 2; Methodical support;
2. Development of the emergency response plan of Working Project “Drilling of a well for pumping of used drilling fluid”, Sakhalin-2, Phase 2; Methodical support of the plan, getting the plan approved by the Ministry of Emergency Response.
3. Preliminary expert review of fire safety, Sakhalin-2, Phase 2; Obtaining of approvals from regulatory authorities.
4. 1. Development of book “Engineering civil defense measures. Emergency response measures” of the working project “Marine cables and a monoethileneglycol pipeline. Pipeline rerouting within water use areas, adjustment of pipeline laying and burying methods. Sakhalin-2, Phase-2. 2. Methodical support of expert review of book “Engineering civil defense measures. Emergency response measures” by the Expert Panel of the Russian Ministry of Emergency Response. 3. Expert review of fire safety of the working project “Marine cables and a monoethileneglycol pipeline. Pipeline rerouting within water use areas, and adjustment of pipeline laying and burying methods”. Sakhalin-2, Phase 2. 4. Methodical support of fire safety Expert review by the Main Directorate of State Fire Fighting Service of the Russian Ministry of Emergency Response.
5. Preliminary expert review of book “Engineering civil defense measures. Emergency prevention measures” of the working project “Rerouting of marine pipelines of Piltun-Astokhskoye hydrocarbon field”, Sakhalin-2, Phase 2. Methodical support of coordination of the document with the Panel of Experts of the Russian Ministry of Emergency Response. Expert review of industrial safety of the working project, methodical support of the project coordination with the Federal Service of Environmental, Technological and Atomic Supervision. Expert review of fire safety of the working project, methodical support.
6. Preliminary expert review of book “Engineering civil defense measures. Emergency prevention measures” of the working project “Construction of onshore pipelines”, Sakhalin-2, Phase 2. Expert review of fire safety of the working project “Construction of onshore pipelines”, methodical support.
7. Development and approval of Emergency Response Plans, Industrial Safety Declarations, Emergency Localization Plans for LUN-A platform. Development and approval of Emergency Response Plans, Industrial Safety Declarations, Emergency Localization Plans for PA-B platform. Organization of the expert review of industrial safety of the Emergency Localization Plan for PA-B platform by a licensed independent expert organization.
8. Preliminary expert review of book “Engineering civil defense measures. Emergency prevention measures” of the working project “Construction of facilities for environmental protection and emergency response in Aniva Gulf”, Sakhalin-2. Methodical support in getting the document approved by the State Panel of Experts of the Russian Ministry of Emergency Response. Expert review of industrial safety of the working project “Construction of facilities for environmental protection and emergency response in Aniva Gulf”, Sakhalin-2, methodical support for obtaining project approval in the Federal Service for Environmental, Technological and Atomic Supervision. Development of the book “Fire safety measures” of the working project “Construction of facilities for environmental protection and emergency response in Aniva Gulf”, Sakhalin-2. Expert review of fire safety of the working project “Construction of facilities for environmental protection and emergency response in Aniva Gulf”, Sakhalin-2, and assistance in getting the document approved by the regulatory authorities.
9. Expert review of the industrial safety declaration of Liquefied Gas Plant, Sakhalin Energy Investment Company Ltd., Sakhalin Island, assistance in getting the declaration approved by the RF regulatory authorities. Expert review of the industrial safety declaration of the Oil export terminal of Sakhalin Energy Investment Company Ltd., Sakhalin Island, and assistance in getting the declaration approved in the RF regulatory authorities.
10. Expert review of the industrial safety declaration of the Jack-up drilling rig Seadrill-6 of Lunskoye filed» within the working project “Construction of special well #8 in Lunskoye gas condensate field”, Sakhalin-2, and assistance in getting the declaration approved by the regulatory authorities.
11. Development of the book “Fire safety measures” of the project “Connection of Molipaq platform to the system of marine pipelines of Piltun-Astokhskoye field. Renovation of the platform”, Sakhalin-2 project; assistance in getting the document approved by the Russian regulatory authorities; adjustment of the fire fighting plan for the project “Connection of Molipaq platform to the system of marine pipelines of Piltun-Astokhskoye field. Renovation of the platform”, Sakhalin-2; assistance in getting the adjusted plan approved by the Russian regulatory authorities.
12. Expert review of the industrial safety declaration for the hydrotechnical facilities of PA-B platform of Sakhalin-2 project; assistance in getting the document approved by the Russian regulatory authorities.
13. Expert review of the industrial safety declaration for the hydrotechnical facilities of LUN-A platform of Sakhalin-2 project; assistance in getting the document approved by the Russian regulatory authorities.
14. Expert review of the industrial safety declaration of the Onshore Processing Facility of Sakhalin-2 project; assistance in getting the document approved by the RF regulatory authorities.
15. Development for marine portions of pipelines:
- from PA-B to the point of connection to onshore pipelines, marine portion of 71,4 km;
- from PA-A to the point of connection to onshore pipelines, marine portion of 46 km;
- from LUN-A to Onshore Processing Facility (2 multiphase pipelines and 1 monoethileneglycol pipeline);
- export oil pipeline from Oil Export Terminal to Tanker Loading Unit (6 km)
and onshore pipelines:
- from the point of connection to the marine pipeline to Onshore Processing Facility (171 km);
- from Onshore Processing Facility to Liquefied Natural Gas Facility (Export Terminal) (636km) (linear pipeline portion, except NKS-2)
Fire fighting plans, Emergency Prevention and Response Plans, Emergency Localization Plans for pipeline commissioning and operation.
Assistance in getting approved by federal, regional and local authorities of the following documents concerning marine portions of pipelines: Fire Fighting Plans, Emergency Prevention and Response Plans, Emergency Localization Plans. The contractor bears expenses associated with the expert review and/or state duties required for approval of the safety documents.
Organization of safety Expert review of the Emergency Localization Plan for offshore and onshore portions of the Sakhalin-2 pipeline system by a licensed independent expert organization, and assistance in the registration of the Plan in the RF regulatory authorities.
16. Development and finalization of documents related to the Industrial Safety Declaration of offshore pipeline portions:
- from PA-B to the point of connection to onshore pipelines, offshore portion of 71, 4 km;
- from PA-À to the point of connection to offshore pipelines, offshore portion of 46 km;
- from LUN-A to Onshore Processing Facility 2 multiphase pipelines and 1 monoethyleneglicol;
- export oil pipeline from Oil Export Terminal to Tanker Loading Unit (6km)
for the phase of commissioning and operation of pipelines; assistance in getting the safety declarations approved by RF federal, regional, local regulatory authorities.
17. Renewal of the Industrial Safety Declaration for oil export terminals, tanker loading units and offshore pipelines according to data provided by the Company.
Organization of the safety declaration expert review by an independent licensed expert organization, and assistance in getting the document approved by RF regulatory authorities.
18. Finalization of book 10 “Engineering civil defense measures. Emergency prevention measures” of the feasibility study for construction of a liquefied gas plant and LNG terminal of Sakhalin-2 Phase 2, according to recommendations of the State Expert Review Panel; assistance in getting the book approved by RF regulatory authorities.
19. The following work was performed to optimize design solutions for Oil Export Terminal construction:
- development of book “Engineering civil defense measure. Emergency prevention measures”, and support of the book evaluation by the State Expert Review Panel of the Ministry of Emergency Response.
- development of book “Fire safety measures” and support of the book evaluation by the State Expert Review Panel of the Ministry of Emergency Response.
Expert review of industrial safety of design documentation, registration of the expert conclusion in the Federal Service of Environmental, Technological and Atomic Supervision.
20. Independent evaluation of compliance of the applicant for a fire hazardous facilities operation license (platforms PA-À, LUN-À, PÀ-B, LNG plant, Oil Export Terminal, Tanker Loading Facility and onshore pipeline system), methodical support of the documents in the federal licensing organization of the RF Ministry of Emergency Response.
21. Document “Special technical requirements for fire safety of LUN-A platform of Sakhalin-2 project, Production phase”, and assistance in getting the document approved by RF regulatory authorities.
22.
1) Finalization of book “Engineering civil defense measures. Emergency response measures” of the working project “Marine cables and monoethyleneglicol pipelie. Pipeline rerouting within water use area, and adjustment of burying and laying methods”, Sakhalin-2, Phase 2, according to recommendations of the State Expert Review Panel from 25.02.2005; assistance in getting the document approved by RF regulatory authorities.
2) Consideration of the documents of the working project “Marine cables and monoethyleneglicol pipeline. Pipeline rerouting within water use area, and adjustment of burying and laying methods”, Sakhalin-2, Phase 2 updated according to recommendations of the Expert Conclusion on project fire safety from 25.02.2005, # 13/77-ÏÁ/05.
3) Finalization of book “Engineering civil defense measures. Emergency response measures” of the project “Rerouting of offshore pipelines of Piltun-Astokhskoye field”, Sakhalin-2, Phase2, according to recommendations of State Expert Review Panel from 04.08.2005; assistance in getting the book approved by RF regulatory authorities.
4) Consideration of documents of the project “Rerouting of offshore pipelines of Piltun-Astokhskoye field”, Sakhalin-2, Phase2 updated according to recommendations of the Expert Conclusion on project fire safety from 02.08.2005.
5) Finalization of book “Engineering civil defense measures. Emergency response measures” of the working project “Onshore Processing Facility”, Sakhalin-2, according to recommendations of State Expert Review Panel from 29.06.2006; assistance in getting the book approved by RF regulatory authorities.
6) Finalization of book “Engineering civil defense measures. Emergency response measures” of the working project “Facilities for environmental protection and emergency prevention in Aniva Gulf, Sakhalin-2” according to recommendations of State Expert Review Panel from 02.02.2006; assistance in getting the document approved by RF regulatory authorities.
Consideration of the updated documents of the project “Facilities for environmental protection and emergency prevention in Aniva Gulf, Sakhalin-2” that was updated according to Expert Conclusion on fire safety from 02.08.2005.
23. Plan of measures and recommendations for categorization and licensing of the measurement and control complex containing radioisotope devices of LUN-A fixed offshore platform.
24. Development and approval of documents for obtaining licenses from Federal Service of Environmental, Technological and Atomic Supervision for “Operation of products containing radioactive substances” and “Transportation and storage of radioactive substances”.
25. For onshore pipelines:
- from the point of connection to offshore pipeline to Onshore Processing Facility (171 km);
- from Onshore Processing Facility to LNG Plant (Oil Export Terminal) (636 km) (linear pipeline portion, except booster station-2)
development of Fire fighting plans, Emergency prevention and response plans, emergency localization plans for pipeline commissioning and operation phases.
Methodical support in the process of consideration and approval in Russian regulatory authorities (federal, regional or local) of Fire fighting plans, Emergency prevention and response plans, Emergency localization plans for onshore pipelines.
Customer: Sakhalin Energy Investment Company
1. Obtaining from Main Directorate of Civil Defense and Emergency Response of Sakhalin Region of basic data and requirements for development of the book “Engineering civil defense measures. Emergency prevention measures” of the working project “Expansion of LNG storage facilities and construction of 1 storage tank of 100 000 cubic meters in Prigorodnoye town”, Sakhalin-2, Phase 2;
Expert review of volume 5 of book “Engineering civil defense measures. Emergency response measures” of the working project, and issuance of the expert conclusion on compliance with civil defense and emergency response regulatory documents;
Methodical support of the expert review of the book in regulatory authorities. Submission of volume 5 of book “Engineering civil defense measures. Emergency response measures” to the State Expert Review Panel of the Russian Ministry of Emergency Response and obtaining of the expert conclusion.
2. Quality control and advisory assistance in the process of expert review of the safety of “Plan of installation of oil and gas module and pedestal crane for Molikpaq platform”.
3. Expert review of the safety declaration of hydrotechnical facilities of Terminal #1 of the special sea port “Prigorodnoye”.
4. Expert review of the safety declaration of the substructures of Terminals #2,3 and 4 of the special port “Prigorodnoye”.
Customer: AMEC Services Limited
1. Development of Book 10 “Engineering civil defense measures. Emergency response measures” of the feasibility study.
Assessment of design data of offshore platforms and tanker loading units.
2. Phase 1: Introduction of modifications of Book 10 “Engineering civil defense measures. Emergency response measures” of the feasibility study for PA-B, LUN-A platforms and tanker loading facility.
Phase 2: preliminary expert review of Book 10 for PA-B, LUN-A platforms and tanker loading facility.
Phase 3: provision of advisory assistance in the process of getting the documents approved by Russian regulatory authorities.
3. Phase 1: Collection of information and development of the industrial safety declaration for PA-B, LUN-A platforms and tanker loading facility.
Phase 2: organization of expert review of the industrial safety declaration by an independent licensed expert panel.
Phase 3: getting the safety declaration approved by Russian regulatory authorities.
Customer: Parsons International Corporation LLC
1. Development of Book 10 “Engineering civil defense measures. Emergency response measures” for obtaining of a permit for construction of Onshore Processing Facility for the feasibility study, Sakhalin-2 project.
Customer: LLC “Starstroy”
1. Development, coordination and approval by relevant authorities of Book 10 “Engineering civil defense measures. Emergency response measures” of the feasibility study, including books:
- “Engineering civil defense measures. Emergency response measures” for the Pipeline System.
- “Engineering civil defense measures. Emergency response measures” for the Oil Export Terminal.
Customer: BIVAK
1. Adjustment of LNG plant inspection and testing plan, Sakhalin-2; Finalization LNG plant inspection and testing plan, Sakhalin-2.
Customer: SakhalinNIPImorneft
1. Development and coordination of design solutions, expert reviews of documents related to the project “Molikpaq platform hook up to the offshore pipelines of Piltun-Astokhskoye field. Platform renovation”, including:
Amendments to Special technical requirements for fire safety.
Book “Labor and working conditions management. Operation and production control”.
Book “Engineering civil defense measures. Emergency response measures”.
Book “Analysis of technological and technogenic risks”.
Development and expert review of the industrial safety declaration and organization of the declaration evaluation by an independent expert panel.
Expert review of the industrial safety of the project.
Expert review of fire safety of the working project “Molikpaq platform hook up to the offshore pipelines of Piltun-Astokhskoye field. Platform renovation”, assistance in getting the document approval by RF regulatory authorities.
Customer: TAU
1. Development of the Book “Engineering civil defense measures. Emergency response measures” of the working project “Construction of gas metering station in Yuzhno-Sakhalinsk area”, Sakhalin-2, Phase 2, and Amendments to Book 10 “Schemes and Drawings”; assistance in getting the document approved by the State Expert Review Panel of the Russian Ministry of Emergency Response.
2. Provision of services related to evaluation of industrial safety of equipment installed on the semisubmersible offshore drilling rig Kantan-3, including:
Evaluation of industrial safety of equipment installed on the semisubmersible offshore drilling platform, preparation and provision of the expert conclusion to the Customer;
Evaluation of the industrial safety of technical devices of the semisubmersible offshore drilling platform with the purpose of obtaining the Permit to Use from the Federal Service of Environmental, Technological and Atomic Supervision;
Preparation of a letter to VNIIS concerning certification of the semisubmersible offshore drilling platform via GOST R system;
Obtaining of explosion protection certificate of electrical equipment of the semisubmersible offshore drilling rig (electric motors, starting equipment).
3. Provision of services related to evaluation of industrial safety of equipment installed on the semisubmersible offshore drilling rig SEADRILL 6 used by Sakhalin Energy Investment Company Limited (hereinafter referred to as General Customer) to drill well Lun-8 of Lunsky license area, Sea of Okhotsk, Sakhalin Region, including:
Evaluation of industrial safety of equipment installed on the semisubmersible offshore drilling rig and provision of the expert conclusion to the Customer;
Evaluation of industrial safety of technical devices of the semisubmersible offshore drilling rig for the purpose of obtaining the Permit to Use from the Federal Service of Environmental, Technological and Atomic Supervision;
Preparation of a letter to VNIIS concerning certification of the semisubmersible offshore drilling rig via GOST R system.
Customer: Worley Parsons International Inc.
1. Development of the book “Engineering civil defense measures. Emergency prevention measures” of the project “Integrated development of Piltun-Astokhsky and Lunsky license areas. Onshore Processing Facility. Storage pipeline”, Sakhalin-2, Phase 2; assistance in getting the document approved by the State Expert Review Panel of the Russian Ministry of Emergency Response.
SAKHALIN-1 PROJECT
Customer: Giprotyumenneftegaz
1. Expert review of Industrial Safety Declaration of Sakhalin-1 facilities construction project.
Customer: Sakhalinskie Proekty
1. Expert review of Industrial Safety Declaration of Chaivo-Boatasino Gas Pipeline project.
Customer: TAU
1. Expert review of Industrial Safety Declaration of Sakhalin-1 facilities construction project.
OVERSEAS CUSTOMERS (company, contract):
France
1. LLC “Soval”. Evaluation of safety of documentation related to operation of explosion hazardous facilities (units USK 0,45) for the purpose of obtaining Permit to Use.
2. ECSA International. Provision of services related to evaluation of technical condition of accessible for inspection parts of ammonia oxidation converters using non-destructive testing methods.
3. Representative office of L’Air Liquide – Central and Western Europe. Evaluation of industrial safety of oxygen extraction membrane units MEDAL manufactured by L’Air Liquide.
Norway
1. CJSC “ARE-STP”. Services related to evaluation of industrial safety of Nokian Tyres project in Vsevolzhsk.
2. AGR Subsea AS. Preparation of documents and methodical support for obtaining of certificate of compliance (GOST R) for riserless drilling equipment manufactured by AGR Subsea AS for Transocean Legend platform under contract # CON SAK 05-067.
Germany
1. LLC “Siemens”. Evaluation of industrial safety of control systems and emergency prevention systems equipment manufactured in Germany, for the purpose of obtaining Permit to Use.
2. CIS and Russia Representative office of KSB AG. Evaluation of industrial safety for the purpose of obtaining Permit to Use for KRG1H-125/315/25-002 centrifugal pump.
Ukraine
1. JSC “FAKEL”. Evaluation of industrial safety for the purpose of obtaining Permit to Use for 7 technical devices.
USA
1. LLC ReedHycalog CIS. Evaluation of industrial safety of rock cutting tools manufactured by ReedHycalog for the purpose of obtaining Permit to Use.
Sweden
1. LLC “OVI Plus”. Evaluation of industrial safety for the purpose of obtaining Permit to Use for LPG equipment Global Star LPG, Global Century LPG manufactured by DWP.
Denmark
1. Haldor Topsoe A/S. Evaluation of industrial safety of sulfuric acid process equipment to be used by Ryazan oil refinery of TNK-BP) under contarct # 21214/S-00470 (obtaining of certificate; evaluation of industrial safety, development of datasheet for pressure tanks). Expert review of industrial safety of design documentation for ammonia unit renovation in JSC “Azot” and provision of expert conclusion.
2. «COWI A/S». Examination of three sites. Development of expert conclusion on radiological environment in seven sites.
Korea
1. Samsung Techwin Co., Ltd. Evaluation of industrial safety of air turbocompressors TM/SM.
Austria
1. SGS Austria, Control Co. Gmbh. Evaluation of industrial safety of design documentation for ammonia unit renovation in JSC “Azot” and provision of expert conclusion on technical devices (Cyclone CYC 600 with SOD-600 device – 1 unit; worm feeder – 1 unit), and assistance in obtaining Permit to Use. Development of data sheets for the equipment.
2. SGS Austria, Control Co. Gmbh. Evaluation of industrial safety of technical devices of pickling and acid recovery line, assistance in obtaining of Permit to Use. Development of data sheets for hoisting equipment.
3. Promteh Technical Consulting, Gmbh. Evaluation of technical condition of engineering structures of dry mix plant LLC “STO-Tikkurila”.
4. Promteh Technical Consulting, Gmbh. Inspection of engineering structures of dry mix plant LLC “STO-Tikkurila”
7. Customer feedback process and after-sales service
Customer feedback process is controlled by Contract Management Service.
8. Major competitors and their products (services)
774 expert organizations have been accredited by Federal Service for Environmental, Technological and Atomic Supervision.
9. Main suppliers of equipment and materials
None
|